Minh Hung Sikico Industrial Land for Sale – Dong Nai

Home|Industrial Factory, Warehouse & Land in Vietnam|Minh Hung Sikico Industrial Land for Sale – Dong Nai
Status
||
Available

Minh Hung Sikico Industrial Land for Sale – Dong Nai

Large-Scale Industrial Land for Manufacturing Investment

Minh Hung Sikico Industrial Park is a large-scale industrial development in the former Binh Phuoc Province, now part of Dong Nai City, offering manufacturers a combination of competitive industrial land cost, substantial land resources and infrastructure designed for a broad range of production activities.

With a planned scale of approximately 655 hectares, including around 475.4 hectares of industrial land, Minh Hung Sikico provides an attractive alternative for manufacturers seeking larger production sites outside the increasingly expensive industrial corridors closer to central Ho Chi Minh City.

Minh Hung SIKICO Industrial Park Master Plan, Dong Nai, Vietnam | TTTFIC Group
Master plan of Minh Hung SIKICO Industrial Park in Dong Nai City, Vietnam, showing industrial land-use zones, infrastructure, internal roads and utility facilities

Current Industrial Land Price: From US$120/sqm

For FDI manufacturers requiring significant land area, long-term production capacity and room for future expansion, Minh Hung Sikico deserves serious consideration.

Former Binh Phuoc – Now Dong Nai Province

Following Vietnam’s administrative restructuring, Minh Hung Sikico Industrial Park is now located within Dong Nai City.

The industrial park was formerly part of Binh Phuoc Province and therefore may still appear under its former provincial designation in historical investment documents, maps and online databases.

For current investment and site-selection purposes, TTTFIC identifies the project under its present administrative geography:

MINH HUNG SIKICO INDUSTRIAL PARK – DONG NAI CITY, VIETNAM

Competitive Industrial Land at US$120/sqm

Industrial land is currently offered from:

US$120/SQM

At this price level, Minh Hung Sikico can be particularly relevant for projects requiring larger land areas where total land occupancy cost materially affects project economics.

Rather than evaluating land price alone, manufacturers should compare the complete investment equation:

LAND COST • REQUIRED AREA • INFRASTRUCTURE • POWER • WATER • WASTEWATER • LOGISTICS • LABOR • INDUSTRY ACCEPTANCE • FUTURE EXPANSION

For larger manufacturing projects, the combination of competitive land cost and available industrial scale can significantly influence the long-term economics of the investment.

Approximately 655-Hectare Industrial Platform

Minh Hung Sikico is planned on a substantially larger scale than many conventional industrial parks.

The overall development is approximately 655 hectares, with around 475.4 hectares designated for industrial land, together with commercial and service areas, technical infrastructure, transportation and green space.

This scale creates opportunities for manufacturers requiring:

LARGE PRODUCTION SITES • MULTI-PHASE FACTORY DEVELOPMENT • FUTURE EXPANSION • INTEGRATED WAREHOUSING • SUPPORTING FACILITIES

Plot availability and configuration remain subject to current confirmation.

A Broad Manufacturing Industry Base

One of Minh Hung Sikico’s important characteristics is its ability to accommodate a relatively broad manufacturing base, subject to project-specific environmental and investment approval.

Potential industries include:

ELECTRONICS • PHARMACEUTICALS • FOOD & AGRICULTURAL PROCESSING • PAPER & PACKAGING • WOOD & FURNITURE • TEXTILE & DYEING • MACHINERY • BUILDING MATERIALS • SUPPORTING INDUSTRIES

This makes the industrial park particularly relevant for projects whose production characteristics may require more careful environmental and wastewater assessment than conventional clean manufacturing.

Final acceptance always depends on the investor’s specific manufacturing process, raw materials, emissions, wastewater characteristics and applicable approvals.

Wastewater Infrastructure for Industrial Manufacturing

For water-intensive manufacturing, wastewater infrastructure is a major site-selection consideration.

Minh Hung Sikico has developed centralized wastewater treatment infrastructure designed for substantial industrial demand, with planned treatment capacity reaching approximately 25,000 m³/day and night.

This infrastructure is particularly relevant when evaluating industries such as food processing, paper, packaging, textile-related manufacturing and other production processes generating significant wastewater.

Investors should nevertheless provide detailed wastewater parameters during the site-selection process so that treatment compatibility and project acceptance can be confirmed before committing to a site.

Power, Water and Industrial Infrastructure

The industrial park is supported by industrial power infrastructure, water supply, telecommunications, internal transportation, drainage and fire-protection systems.

Its internal road network has been designed to support industrial transportation, with major roads and branch roads serving manufacturing plots throughout the development.

For projects with substantial electricity, water or wastewater demand, TTTFIC recommends verifying required capacity against current infrastructure availability before final site selection.

Regional Connectivity

Minh Hung Sikico provides access toward the major industrial and logistics corridors connecting Dong Nai, Ho Chi Minh City, the former Binh Duong industrial region, the Central Highlands and Cambodia.

The industrial park is positioned near important transportation corridors including National Highway 13 and National Highway 14, while future and developing expressway and railway infrastructure can further strengthen regional connectivity.

For manufacturers sourcing agricultural, forestry or other raw materials from the Central Highlands, this location can provide an additional strategic advantage.

Suitable for Large Manufacturing Projects

Minh Hung Sikico should be evaluated particularly seriously by investors whose projects require:

LARGE INDUSTRIAL LAND • COMPETITIVE LAND COST • HIGHER WATER DEMAND • WASTEWATER TREATMENT CAPABILITY • LONG-TERM FACTORY EXPANSION • ACCESS TO SOUTHERN VIETNAM & CENTRAL HIGHLANDS

This combination differentiates Minh Hung Sikico from smaller industrial parks where available plots or infrastructure capacity may constrain future expansion.

TTTFIC Site Selection & Investment Support

TTTFIC Group supports FDI investors evaluating Minh Hung Sikico Industrial Park from initial site selection through investment implementation.

Our team can coordinate:

SITE SELECTION • CURRENT LAND AVAILABILITY • SITE SURVEY • DEVELOPER COORDINATION • COMMERCIAL NEGOTIATION • INDUSTRY ACCEPTANCE • IRC/ERC • ENVIRONMENTAL PROCEDURES • DESIGN & BUILD • PROJECT IMPLEMENTATION

For projects comparing several locations, TTTFIC can also prepare alternative industrial park options based on required land area, industry, utilities, logistics, labor and investment budget.

Investors can review the Minh Hung Sikico Industrial Park profile and the Dong Nai Province Vietnam 2026 Investment Profile for additional location and investment information.

Current Investment Opportunity

MINH HUNG SIKICO INDUSTRIAL PARK – DONG NAI

FORMER BINH PHUOC PROVINCE

APPROX. 655-HA INDUSTRIAL PLATFORM

CURRENT PRICE: FROM US$120/SQM

LARGE-SCALE MANUFACTURING OPPORTUNITIES

BROAD INDUSTRY ACCEPTANCE

STRONG WASTEWATER INFRASTRUCTURE

For current land availability, plot configuration, industry acceptance and commercial terms, contact TTTFIC Group.

TTTFIC Group – Industrial Real Estate & FDI Site Selection

20+ Years of Industrial & FDI Project Experience

Vietnam Nationwide + Thailand

Industrial Land • Ready-Built Factory • Existing Factory • Build-to-Suit • Site Selection • Legal Coordination • Design & Build

T: +84 274 633 6888
M / WhatsApp: +84 936 431 788
E: marketing@tttfic.com
Industrial Land Sales: +84 973 108 629

Land price, availability, infrastructure capacity, industry acceptance, incentives and commercial conditions are subject to current confirmation.

Product type
Industrial Land for Sale
Total area
Flexible industrial plots – Subject to availability
Construction area
Subject to plot-specific planning regulations
Office area
Investor-designed
Secondary works
Investor-designed
Fire protection system
Industrial fire protection infrastructure – Subject to project design
Power system
110/22kV industrial power infrastructure – Capacity subject to confirmation
Used Time
Until 2066 – Subject to plot-specific legal confirmation
Manufacturing industry
Multi-industry manufacturing – Subject to project-specific acceptance
Ho Chi Minh City Center - 89 km
Tan Cang - Cai Mep Teminal - 145 km
Tan Son Nhat International Airport - 84 km
0,05 USD/KWh
0,57 USD/m3
0,45 USD/m3
Management fee: 0,045 USD/sqm/month
0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Submit a review

  • Required
  • Required
  • Required

There are no reviews yet

Our Members