21,885 SQM Factory for Lease – Binh Chieu Industrial Park

Home|Industrial Factory, Warehouse & Land in Vietnam|21,885 SQM Factory for Lease – Binh Chieu Industrial Park
Status
||
Available

21,885 SQM Ready-Built Factory for Lease – Binh Chieu Industrial Park, Ho Chi Minh City

I. Factory Overview

TTTFIC Group introduces a modern 21,885.44 m² two-story ready-built factory for lease in Binh Chieu Industrial Park, Tam Binh Ward, Ho Chi Minh City, Vietnam.

The property occupies a project site of approximately 23,181.57 m², with flexible production spaces, modern industrial infrastructure, and a design targeting LEED Silver certification.

Expected handover: November 2026, subject to final completion and acceptance.

Explore Binh Chieu Industrial Park.

3D visualization of a ready-built factory for lease at Binh Chieu Industrial Park in Ho Chi Minh City, showing the exterior loading docks and interior freight elevator facilities.
Ready-built industrial factory with loading docks and freight elevators at Binh Chieu Industrial Park.

II. Strategic Location & Regional Connectivity

Located in eastern Ho Chi Minh City, the factory offers convenient access to industrial clusters, rail freight terminals, seaports, and international air transportation.

Destination Approx. Distance
Song Than Railway Station 4 km
Di An Railway Station 5 km
Song Than I Industrial Park 5 km
VSIP I Industrial Park 10 km
Tan Son Nhat International Airport 14 km
Cat Lai Port 18 km

Distances are based on the project brochure and may vary by route.

Discover the Ho Chi Minh City Investment Profile.

III. Factory Specifications & Leasing Terms

Description Specifications
Project Site Area Approx. 23,181.57 m²
Total Factory Floor Area 21,885.44 m²
Ground Floor 10,942.72 m²
Second Floor 10,942.72 m²
Flexible Rental Units Approx. 2,400–3,800 m²
Ground Floor Clear Height 12 m
Second Floor Clear Height 4.8 m
Ground Floor Loading 4,000 kg/m²
Second Floor Loading 1,200 kg/m²
Electrical Substation 2,500 kVA
Freight Elevator 4,000 kg
Passenger Elevator 800 kg
Loading Facilities 12 dock levelers, per project information
Fire Protection Fire protection infrastructure
Green Building Targeting LEED Silver
Expected Handover November 2026

Indicative Rental Rates

  • Ground floor: USD 6.70/m²/month
  • Second floor: USD 6.20/m²/month
  • Rental rates exclude 10% VAT.
  • Published rental rates are stated as fixed throughout the lease term, subject to the final agreement.
  • Lease duration and security deposit: Upon request.

IV. Operating & Investment Costs

Cost Item Indicative Rate
Management & Maintenance USD 0.60/m²/month
Wastewater Treatment USD 1.20/m³
Motorcycle Parking VND 120,000/vehicle/month
Fresh Water Supplier tariff plus 10%
Electricity Direct contract with the electricity provider
Labor Costs Based on workforce requirements and prevailing market rates

Service charges are subject to applicable taxes and adjustments. Domestic and hazardous waste disposal charges are excluded.

V. Manufacturing & Supporting Industries

Binh Chieu Industrial Park and the surrounding industrial corridor support engineering, electronics, mechanical components, packaging, food processing, textiles, and industrial services.

The wider manufacturing ecosystem includes companies such as Carrier Vietnam and Bachy Soletanche Vietnam, alongside suppliers serving the Song Than and VSIP industrial clusters.

Eligible activities may include electronics, precision engineering, electrical equipment, industrial printing, textiles, food processing, and selected logistics operations, subject to regulatory approval.

VI. Investment Feasibility & Competitive Advantages

The factory offers several competitive advantages:

  • Strategic location within Ho Chi Minh City’s established industrial network.
  • Large-scale, flexible two-story production facilities.
  • High ground-floor loading capacity and 12-meter clear height.
  • Dedicated 2,500 kVA electrical substation and freight-handling infrastructure.
  • Convenient access to rail terminals, Cat Lai Port, and Tan Son Nhat Airport.
  • Design targeting LEED Silver standards.

The property is suitable for manufacturers seeking modern industrial space, supply-chain connectivity, and long-term operational flexibility.

FDI INVESTORS — CONTACT TTTFIC GROUP

Request updated availability, floor plans, leasing terms, and an on-site inspection.

Vietnam Nationwide + Thailand

T: +84 274 633 6888
M / WhatsApp: +84 936 431 788
E: marketing@tttfic.com
Industrial Land Sales: +84 973 108 629

 

Product type
Two-Story Ready-Built Factory for Lease
Total area
Approx. 23,181.57 m² project site
Construction area
21,885.44 m² total factory floor area
Office area
Upon Request
Secondary works
Freight elevator, passenger elevator, loading docks, parking and technical infrastructure
Fire protection system
Fire protection infrastructure; acceptance status to be confirmed
Power system
2,500 kVA
Used Time
Expected handover November 2026; lease term upon request
Manufacturing industry
Electronics, engineering, textiles, food processing, industrial services and other approved activities
Ho Chi Minh City - km
SAIGON NEW PORT - 15 km
Tan Son Nhat International Airport - 15 km
0,08
0.38
0,35
Management fee 0.5 USD/m2s
0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Submit a review

  • Required
  • Required
  • Required

There are no reviews yet

Our Members