Thanh Loc Industrial Park

Home|INDUSTRIAL PARKS IN VIETNAM|Thanh Loc Industrial Park
Information
Operating time: Updating - Updating
Total Area: 251,98 ha
Infrastructure investors: Management Board of Economic Zones of An Giang Province
Price: 50 USD/m2
Building density: 60%
Occupancy: 61.4
Address: Thanh Hung Commune, An Giang Province, Vietnam

I. Overview of Thanh Loc Industrial Park:

Thanh Loc Industrial Park is situated in Thanh Loc commune, An Giang Province, Vietnam.
Thạnh Lộc Industrial Park, with a total area of 250 hectares, undergoes investment in two phases (Phase 1: 150 hectares and Phase 2: 100 hectares)… The park’s planning includes a residential area for workers and resettlement covering an area of 60.43 hectares, with investment led by the Management Board of An Giang Economic Zones.
The industrial park is located along the southern coastal corridor, connecting Vietnam, Cambodia, and Thailand, and is connected to National Highway 80. It is also bordered by the Cái Sắn canal and the Vành Đai canal. This strategic location facilitates convenient transportation and logistics via road, waterway, and air routes.
The availability of a substantial labor force in the area meets the workforce demands of various industries upon investment in this location.
Furthermore, the industrial park falls within a socio-economically challenged area, making it eligible for high investment incentives.

Master map plan of Thanh Loc Industrial Park – Kien Giang Province
Master map plan of Thanh Loc Industrial Park – An Giang Province – TTTFIC Group

II. Infrastructure of Thanh Loc Industrial Park:

Transportation System:

Each side has 2 lanes, with a width of 18m (each lane is 7.5m), and a 3m median strip.

Electricity System:

Supplied by 2 22kV medium-voltage grids from Rach Gia City and Chau Thanh District.

Water System:

A water supply plant in the industrial park with a capacity of 5,000 m3/year.

Wastewater Treatment System:

Under construction is a centralized wastewater treatment plant in the industrial park with a capacity of 4,000 m3/day and night.

Firefighting System:

Fire hydrants are installed along the main roads.

Communication:

VNPT Kien Giang installs high-speed telephone and internet lines to meet the requirements of investors.

Other Information:

Complete investment in basic infrastructure elements:

  • Stormwater drainage system.
  • Lighting system and transformer stations.
  • Industrial park gates and fences.
  • Paving and green planting on Road No.4.
  • Furthermore, the industrial park has implemented other infrastructure items to support the operation of projects within its premises.
Thanh Loc Industrial Park - Kien Giang Province - TTTFIC group
Thanh Loc Industrial Park – An Giang Province – TTTFIC group

III. Industry attracting investment in The Industrial Park:

The industries currently receiving significant focus for development and investment in the industrial park include:

Phase 1: Encouraging industrial production investment in various sectors, including:

  • Agro-processing and preservation of agricultural and aquatic products.
  • Food and beverage manufacturing.
  • Consumer goods and packaging production.
  • Electronics assembly.
  • Textile and footwear manufacturing.
  • Paper product manufacturing.
  • Wood processing and production of wooden products.
  • Building materials, plastics, and glass production.

Phase 2: Investing in the construction and operation of industrial park infrastructure.

FB: https://www.facebook.com/TTTFICgroup

Industrial Land & Factory Availability in Vietnam | TTTFIC Group

TTTFIC Group | Vietnam Industrial Investment Intelligence & Business Advisory

TTTFIC Group provides industrial investment intelligence, industrial real estate advisory, site selection, factory and warehouse solutions, and business advisory services for foreign investors seeking to establish, expand, relocate, acquire, lease, or invest in manufacturing operations in Vietnam.

Industrial land, ready-built factories, warehouses, industrial parks, economic zones, high-tech parks, export processing zones, and other investment opportunities displayed on TTTFIC.com are provided for preliminary investor reference. Availability, pricing, infrastructure readiness, legal status, investment incentives, industry acceptance, and transaction conditions may change over time and should be independently verified before any investment decision is made.

TTMS™ Investment Status Control

Under the TTTFIC Transaction Management Standard – TTMS™, investment opportunities are evaluated according to their actual development and transaction status. TTTFIC Group distinguishes between Planned, Approved, Under Development, Infrastructure-Ready, Operating, and Currently Available opportunities. The appearance of an industrial park, industrial property, project, or investment location on this website does not automatically mean that land, factories, warehouses, licenses, utilities, or investment capacity are currently available.

Before recommending an opportunity for an investor’s shortlist, site visit, negotiation, or transaction, TTTFIC Group may conduct updated verification covering industrial land and factory availability, developer or asset-owner confirmation, pricing and commercial terms, land-use and project legal status, industry and zoning compatibility, IRC/ERC requirements, environmental compliance, fire prevention and fighting requirements, infrastructure and utility readiness, logistics connectivity, investment incentives, transaction conditions, and counterparty due diligence.

Industrial Investment Services for Foreign Investors in Vietnam

TTTFIC Group supports qualified foreign investors throughout the investment lifecycle, including Vietnam market entry, industrial site selection, industrial park comparison, industrial land acquisition and leasing, ready-built factory and warehouse leasing, built-to-suit factory solutions, factory acquisition and M&A, investment due diligence, transaction negotiation, IRC and ERC procedures, environmental and fire-safety compliance, legal coordination, construction support, and post-investment implementation.

Our controlled investment advisory process follows a structured decision pathway:

INVESTOR REQUEST → REQUIREMENT ANALYSIS → MARKET SCREENING → VERIFICATION → SHORTLIST → DUE DILIGENCE → SITE VISIT → NEGOTIATION → TRANSACTION → IMPLEMENTATION

This process is designed to help investors move beyond basic property listings and evaluate industrial investment opportunities based on verified commercial, legal, technical, infrastructure, location, and transaction considerations.

Verify Before You Invest

Industrial real estate conditions in Vietnam can change rapidly. Industrial land may become reserved or unavailable, factory inventory may be leased or sold, infrastructure schedules may change, and certain industries may require additional environmental, technical, zoning, or regulatory approvals. Investors should therefore request an updated verification from TTTFIC Group before relying on historical availability, pricing, project status, or other information published on the website.

TTTFIC Group | Your Trusted Partner in Vietnam’s Industrial Investment

Investor Advisory: +84 274 633 6888
Factory for Sale: +84 93 643 1788
Factory for Lease: +84 916 97 4488
Industrial Land: +84 973 108 629
Email: info@tttfic.com | marketing@tttfic.com

Head Office: No. 290 Dong Khoi Street, Binh Duong Ward, Ho Chi Minh City, Vietnam.

TTMS™ Controlled Investment Information | Verify Before Decision

0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Review is closed
Booking Tour
[wpforms id="179"]
Our Members