No. FA/WA-19552
Ready-Built Factory for Lease at Le Minh Xuan 3 Industrial Park
- Price: US$5.60/sqm/month
- Area: Ready-built factory options from approximately 680 sqm – Subject to availability
Approximately 32,000 m² of land | Approximately 33,000 m² of factory floor area | Asking US$7.5 million — negotiable
TTTFIC Group introduces a factory complex for sale in Nam Tan Uyen Expansion Industrial Park, Ho Chi Minh City, Vietnam. The property combines an approximately 3.2-hectare industrial site with two two-story production buildings and supporting office facilities.
At an asking price of US$7.5 million, negotiable, the opportunity merits consideration by manufacturers seeking a substantial operating base and investors evaluating an industrial property acquisition in southern Vietnam.
The asking consideration equates to approximately US$234 per m² of land area, including the existing buildings within the proposed sale scope. This provides a useful acquisition cost benchmark for comparison with alternative sites and development proposals.
Learn more about the location through the Nam Tan Uyen Expansion Industrial Park profile.

Located on Nam Tan Uyen Expansion Industrial Park, Tan Uyen Ward, Ho Chi Minh City, the property forms part of the established manufacturing corridor formerly within Binh Duong. Regional connections include the DT746 and DT747B road network.
| Destination | Published approximate park-level distance |
|---|---|
| Thanh Phuoc River Port | 8 km |
| Song Than ICD | 18 km |
| Song Than Freight Railway Station | 19 km |
| Central Ho Chi Minh City | 30 km |
| Cat Lai Port | 32 km |
| Tan Son Nhat International Airport | 34 km |
| Binh Duong New City area | 8–10 km |
| Twin Doves Golf Club | 10 km |
These are published industrial-park references. Actual factory-gate road distances, container access and journey times should be checked for the buyer’s supply chain. The surrounding urban area provides access to workforce accommodation, banking, dining, healthcare and other business services.
| Item | Property information |
|---|---|
| Offering | Entire factory complex |
| Approximate land area | 32,000 m² |
| Approximate total factory floor area | 33,000 m² across two production buildings |
| Production buildings | Two two-story factory buildings |
| Offices | Supporting office facilities; total area included in the sale to be reconciled with approved drawings |
| Supporting facilities | Internal circulation, yards and ancillary facilities; final inventory to be agreed |
| Fire protection | Automatic system reported; coverage and certification for the entire sale scope to be reviewed |
| Power supply | Installed transformer capacity and available load to be confirmed |
| Building condition | Existing factory complex; construction year and condition assessment available subject to document provision and inspection |
| Land-use expiry | To be confirmed from the property’s land certificate and land sublease documentation |
| Transfer structure | Asset/remaining land-use or sublease rights transaction, or company/share acquisition, subject to legal review and seller agreement |
| Handover and occupancy | To be agreed after confirmation of current leases and possession arrangements |
| Proposed industries | Industrial park-permitted activities, subject to the buyer’s process and required approvals |
The seller reports construction permits, completion acceptance documentation and approval for leasing. Buyers should review the actual documents, title, encumbrances, remaining land term and transaction eligibility for the entire property.
| Item | Indicative amount |
|---|---|
| Total asking price | US$7,500,000 — negotiable |
| Asking price divided by approximate land area | US$234.38/m² |
| Asking price divided by approximate factory floor area | US$227.27/m² |
Both unit figures divide the same total consideration by different area measures. They are comparison metrics, not separate charges or an allocation of land and building value. Final included assets, taxes, transaction costs, currency and payment arrangements are subject to agreement and applicable requirements.
The buyer’s total investment should include the agreed consideration, applicable taxes and transaction expenses, legal and technical due diligence, any industrial park transfer or administration charges, refurbishment and production fit-out.
| Operating item | Assessment basis |
|---|---|
| Industrial park management | Confirm the current tariff and whether charged on land or another agreed basis |
| Water and wastewater | Confirm current unit rates, discharge limits and billing methodology |
| Electricity | Confirm supply voltage, transformer ownership, contracted capacity and time-of-use tariff |
| Waste services | Obtain quotations for the proposed production process |
| Maintenance, insurance and inspections | Assess the full complex and annual operating obligations |
| Workforce | Prepare current salary and benefit budgets by role, shift and skill level |
For preliminary context, older published park references include management at VND9,300/m²/year, water at US$0.40/m³ and wastewater treatment at US$0.28/m³. These are not confirmed current quotations for this property.
Electricity should be budgeted separately for normal, peak and off-peak consumption at the applicable voltage level. Request the latest supplier schedule and recent electricity bills to model the proposed operation accurately.
Nam Tan Uyen Expansion and the surrounding Tan Uyen manufacturing corridor offer a business environment covering furniture, wood products, packaging, industrial services and logistics. Published park directories identify Home Decor Cai Xing, Kong Richs Furniture Vietnam and Keumsung Paper Vietnam among the area’s businesses.
The surrounding supplier base may support packaging procurement, equipment servicing, transport and subcontracting. Named businesses are location references; current operations and commercial suitability require confirmation.
Approximately 32,000 m² of land and 33,000 m² of factory floor area provide scale for a buyer considering production consolidation, relocation or expansion. Existing buildings may reduce the development work required compared with a new construction project, depending on technical suitability and upgrade needs.
At approximately US$234/m² of land area including the proposed building sale scope, the asking price provides a concrete basis for acquisition discussions. Buyers can compare the total purchase and upgrade budget with alternatives after aligning land tenure, construction quality, usable floor area and transaction costs.
The two-building configuration may support owner occupation, phased use or a leasing strategy, subject to layout, access, approvals and existing commitments. A separately marketed portion offers 16,720 m² of factory space at an initial asking rent of US$3.80/m²/month, with offices and ancillary areas separately charged. This is an asking rental offer, not evidence of an executed lease or guaranteed income for the full complex.
The surrounding manufacturing network and regional logistics links support the property’s relevance to companies seeking a southern Vietnam industrial base.
TTTFIC’s assessment: the combination of site scale, existing production space and a negotiable US$7.5 million asking price warrants a focused site inspection and document review. Final acquisition value depends on the remaining land term, transfer structure, building condition, occupancy and suitability for the buyer’s project.
Contact TTTFIC Group for the current sale scope, available legal and technical documents, transaction discussions and an accompanied factory inspection.
TTTFIC Group — Your Strategic Partner for Industrial Investment in Vietnam.
Product type |
Factory Complex for Sale |
|---|---|
Total area |
Approx. 32,000 m² land area |
Construction area |
Approx. 33,000 m² total factory floor area across two two-story buildings; total footprint to be verified |
Office area |
Office facilities included; total sale-scope office area to be confirmed |
Secondary works |
Internal circulation, yards and ancillary facilities — final asset inventory to be agreed |
Fire protection system |
Automatic system reported; full-complex documentation and coverage to be verified |
Power system |
Installed transformer capacity and available load to be confirmed |
Used Time |
Remaining land-use term to be confirmed from title and land sublease documents |
Manufacturing industry |
Industrial park-permitted activities, subject to project-specific approvals |
| HCMC Center - 30 km | |
| ICD Song Than Port - 18 km | |
| Tan Son Nhat International Airport - 34 km | |
| 0,05 USD/KWh | |
| 0,4 USD/m3 | |
| 0,28 | |
| Management fee: 9.300 VND/m2/year | |
| Contact: | TTTFIC GROUP |
|---|---|
| Hotline: | +84 274 633 6888 |
| Factories Sales | +84 93 6 43 1788 |
| Warehouse Rental | +84 916 97 4488 |
| Industrial Land Sales | +84 973 108 629 |
| Manager | info@tttfic.com |
| Marketing | marketing@tttfic.com |
0 customer reviews
1
0%0 review
2
0%0 review
3
0%0 review
4
0%0 review
5
0%0 review
There are no reviews yet
| Contact: | TTTFIC GROUP |
|---|---|
| Hotline: | +84 274 633 6888 |
| Factories Sales | +84 93 6 43 1788 |
| Warehouse Rental | +84 916 97 4488 |
| Industrial Land Sales | +84 973 108 629 |
| Manager | info@tttfic.com |
| Marketing | marketing@tttfic.com |
No. FA/WA-19552
No. N/A
No. FA/WA-19503
No. LAND-18562