Bac Dong Hoi Industrial Park - Quang Tri

Home|INDUSTRIAL PARKS IN VIETNAM|Bac Dong Hoi Industrial Park – Quang Tri
Information
Operating time: 2008 - 2058
Total Area: 181 ha
Infrastructure investors: Quang Tri province industrial park management board
Price: 20 USD/m2
Building density: 60%
Occupancy: 78%
Address: Dong Son Ward / [Ly Trach mapping unclear], Quang Tri Province, Vietnam

I. Overview of Bac Dong Hoi Industrial Park – Quang Tri

Bac Dong Hoi Industrial Park – Quang Tri

Bac Dong Hoi Industrial Park was established under Decision No. 2696/QD-UBND dated September 24, 2009, by the People’s Committee of Quang Tri province, with a total area of 134.95 hectares. Currently, the industrial park’s area has been fully occupied.

Geographical Location:

Bac Dong Hoi Industrial Park is situated in both Thuan Duc commune, Dong Hoi City, and Ly Trach commune, Bo Trach district, Quang Tri province. Boundaries:

  • The existing industrial park borders National Highway 1A, avoiding Dong Hoi City, to the east.
  • To the north, it borders pine forests and is approximately 350 meters away from the boundary of Ly Trach commune.
  • To the south, it borders Phan Dinh Phung Street.
  • To the west, it borders pine forests in Ly Trach and Thuan Duc communes.

Bac Dong Hoi Industrial Park has completed the main transportation system, land leveling, and has attracted investments that occupy approximately 80% of the industrial land area. Of the 26 projects invested in the industrial park, 11 projects are currently in operation.

II. Expansion of Bac Dong Hoi Industrial Park – Quang Tri

Under Decision No. 4599/QD-UBND dated December 4, 2020, the authorities approved the detailed 1/500 expansion plan of Bac Dong Hoi Industrial Park. The total land area for use is 45.62 hectares.

Geographical Location:

The expanded Bac Dong Hoi Industrial Park is located in Bac Ly ward and Loc Ninh commune, Dong Hoi City, Quang Tri province. Boundaries:

  • To the north, it borders production forest land.
  • To the south, it borders Phan Dinh Phung Street.
  • To the east, it borders production forest land and the 36m wide planned road to Loc Ninh.
  • To the west, it borders the bypass road of Dong Hoi City.

After expansion, Bac Dong Hoi Industrial Park will have a total area of over 181 hectares, including the existing industrial park area of 136 hectares.

With its convenient location, enabling quick transportation and access to the labor force and markets, this position allows for easy movement to neighboring areas, thereby benefiting both investors and employees in Bac Dong Hoi Industrial Park.

Master plan map of Bac Dong Hoi Industrial Park - Quang Tri Province - TTTFIC Group
Master plan map of Bac Dong Hoi IP – Quang Tri Province – TTTFIC Group

III. Infrastructure of Bac Dong Hoi Industrial Park – Quang Tri

Internal transportation:

  • The internal transportation system has been invested in and constructed comprehensively, with a well-designed layout, smooth traffic flow, and convenience.
  • Along the roads, there are 2-meter-wide sidewalks, where underground utility corridors such as electricity, water supply and drainage, and information systems are located.

Electricity system:

  • There are two power lines, a 220kV line and a 35kV line, with a 110kV transformer substation.

Public lighting system:

  • The street lighting network is designed separately from the residential power supply system and is arranged along the transportation axes.

Water system:

  • The water supply for both domestic and industrial use in the industrial park ensures the full demand of investors.

Drainage system for wastewater and rainwater:

  • There is a separate system for rainwater drainage from the wastewater drainage system. The industrial park’s drainage channel will receive the discharge of all rainwater.

Waste management:

  • Solid waste in the industrial park will be collected and transported to a transfer station, where it will be source-separated before being transported to the treatment area.

Wastewater treatment:

  • Wastewater will be collected and treated at a centralized wastewater treatment plant, meeting Grade A standards (TCVN 5945-1995).

Communication information system:

  • The industrial park’s communication information center has installed telephone lines up to the boundaries of the land plots, providing sufficient capacity without limitations through its connectivity system.

IV. Investment-attractive sectors of Bac Dong Hoi Industrial Park – Quang Tri

  • Export-oriented garment production, export-oriented leather footwear production
  • Manufacturing consumer goods
  • Installation of electronic and refrigeration equipment
  • Mechanical engineering and high-end equipment repair
  • Processing of forest products, production of fine woodcrafts
  • Food processing industry, agriculture, and forestry
  • Transportation and logistics.
The transportation of Bac Dong Hoi Industrial Park - Quang Tri Province - TTTFIC Group
The transportation of Bac Dong Hoi IP – Quang Tri Province – TTTFIC Group

V. Investment incentives policy:

Tax incentives: Corporate income tax

For projects located within Dong Hoi City:

  • A preferential tax rate of 17% for a period of 10 years, starting from the first year the enterprise generates revenue from the new investment project.
  • Tax exemption for 2 years and a 50% tax reduction for the following 4 years, starting from the first year of taxable income. In case there is no taxable income in the first three years, the tax exemption and reduction period will be counted from the fourth year onwards.

For projects located within Bo Trach district:

  • A preferential tax rate of 10% for a period of 15 years, starting from the first year the enterprise generates revenue from the new investment project.
  • Tax exemption for 4 years and a 50% tax reduction for the following 9 years, starting from the first year of taxable income from the new investment project.

Land rental incentives:

Exemption from land rental fees and water surface rental fees during the basic construction period, but not exceeding 3 years from the date of the land and water surface rental decision. After the basic construction period, the exemptions are as follows:

  • For projects located within Dong Hoi City: 7 years.
  • For projects located within Bo Trach district: 11 years.

VI. Labor resources and costs:

Human resources:

  • With a labor force of 433,618 people, Quang Binh boasts an ample workforce, representing approximately 52.26% of the total population.
  • Regarding labor quality, according to the population survey as of April 1, 1999, there were 10,720 people with a college degree or higher, including 4,676 with a college degree and 6,042 with a university degree or higher.
  • Nearly 33,000 workers have received training, accounting for 8% of the labor force.

Labor costs:

  • Bac Dong Hoi Industrial Park is located in Dong Hoi City and Bo Trach district, Quang Tri province, belonging to Regions II and III.
  • Therefore, the minimum wage in Regions II and III is 3,920,000 VND and 3,430,000 VND per month, respectively.

Contact to TTTFIC Group

Industrial Land & Factory Availability in Vietnam | TTTFIC Group

TTTFIC Group | Vietnam Industrial Investment Intelligence & Business Advisory

TTTFIC Group provides industrial investment intelligence, industrial real estate advisory, site selection, factory and warehouse solutions, and business advisory services for foreign investors seeking to establish, expand, relocate, acquire, lease, or invest in manufacturing operations in Vietnam.

Industrial land, ready-built factories, warehouses, industrial parks, economic zones, high-tech parks, export processing zones, and other investment opportunities displayed on TTTFIC.com are provided for preliminary investor reference. Availability, pricing, infrastructure readiness, legal status, investment incentives, industry acceptance, and transaction conditions may change over time and should be independently verified before any investment decision is made.

TTMS™ Investment Status Control

Under the TTTFIC Transaction Management Standard – TTMS™, investment opportunities are evaluated according to their actual development and transaction status. TTTFIC Group distinguishes between Planned, Approved, Under Development, Infrastructure-Ready, Operating, and Currently Available opportunities. The appearance of an industrial park, industrial property, project, or investment location on this website does not automatically mean that land, factories, warehouses, licenses, utilities, or investment capacity are currently available.

Before recommending an opportunity for an investor’s shortlist, site visit, negotiation, or transaction, TTTFIC Group may conduct updated verification covering industrial land and factory availability, developer or asset-owner confirmation, pricing and commercial terms, land-use and project legal status, industry and zoning compatibility, IRC/ERC requirements, environmental compliance, fire prevention and fighting requirements, infrastructure and utility readiness, logistics connectivity, investment incentives, transaction conditions, and counterparty due diligence.

Industrial Investment Services for Foreign Investors in Vietnam

TTTFIC Group supports qualified foreign investors throughout the investment lifecycle, including Vietnam market entry, industrial site selection, industrial park comparison, industrial land acquisition and leasing, ready-built factory and warehouse leasing, built-to-suit factory solutions, factory acquisition and M&A, investment due diligence, transaction negotiation, IRC and ERC procedures, environmental and fire-safety compliance, legal coordination, construction support, and post-investment implementation.

Our controlled investment advisory process follows a structured decision pathway:

INVESTOR REQUEST → REQUIREMENT ANALYSIS → MARKET SCREENING → VERIFICATION → SHORTLIST → DUE DILIGENCE → SITE VISIT → NEGOTIATION → TRANSACTION → IMPLEMENTATION

This process is designed to help investors move beyond basic property listings and evaluate industrial investment opportunities based on verified commercial, legal, technical, infrastructure, location, and transaction considerations.

Verify Before You Invest

Industrial real estate conditions in Vietnam can change rapidly. Industrial land may become reserved or unavailable, factory inventory may be leased or sold, infrastructure schedules may change, and certain industries may require additional environmental, technical, zoning, or regulatory approvals. Investors should therefore request an updated verification from TTTFIC Group before relying on historical availability, pricing, project status, or other information published on the website.

TTTFIC Group | Your Trusted Partner in Vietnam’s Industrial Investment

Investor Advisory: +84 274 633 6888
Factory for Sale: +84 93 643 1788
Factory for Lease: +84 916 97 4488
Industrial Land: +84 973 108 629
Email: info@tttfic.com | marketing@tttfic.com

Head Office: No. 290 Dong Khoi Street, Binh Duong Ward, Ho Chi Minh City, Vietnam.

TTMS™ Controlled Investment Information | Verify Before Decision

0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Submit a review

  • Required
  • Required
  • Required

There are no reviews yet

Booking Tour
[wpforms id="179"]
Our Members