Dong Van I Industrial Park - Ninh Binh

Home|INDUSTRIAL PARKS IN VIETNAM|Dong Van I Industrial Park – Ninh Binh
Information
Operating time: 2021 - 2071
Total Area: 368.1 Ha
Infrastructure investors: Plastic Chemical Group Joint Stock Company
Price: 70 USD/m²
Building density: 60%
Occupancy: Updating
Address: Dong Van Ward, Duy Minh Ward and Bach Thuong Ward, Ninh Binh Province, Vietnam

Overview of Dong Van I Industrial Park – Ninh Binh

Dong Van I Industrial Park – Ninh Binh is the earliest invested and constructed industrial park in Ninh Binh province, with modern and synchronized infrastructure and facilities.
Total planned area of Dong Van I Industrial Park – Ha Nam: 368.1 hectares.

Dong Van I Industrial Park:

Decision 1117/QD-UBND dated September 14, 2007 by the People’s Committee of Ninh Binh province regarding the establishment of Dong Van I Industrial Park (221.2 hectares).

The industrial park is located in Dong Van, Duy Minh, and Bach Thuong wards, Duy Tien town, Ninh Binh province.

The provincial Industrial Park Management Board is the investor of the industrial park. The management board has implemented infrastructure investment on an area of 221.2 hectares (including 153.5 hectares of industrial land).

Currently, the industrial park’s infrastructure ensures synchronization, including transportation system, power supply system, rainwater drainage system, wastewater drainage system, wastewater treatment plant, clean water system, and telecommunications.

The industrial park has reached 100% occupancy rate.

Dong Van I Industrial Park Expansion:

Decision 817/QD-UBND dated May 27, 2021 by the People’s Committee of  Ninh Binh province regarding the establishment of the expanded Dong Van I Industrial Park in the northeast of the Vuc Vong intersection (149.6 hectares).

The industrial park is located in Yen Bac ward, Bach Thuong town, Duy Tien district, Ninh Binh province.

The Chemical Plastic Joint Stock Company is the investor of the industrial park:

– Phase I (Zone A):

  • Covering an area of 100 hectares, with 71.4 hectares of industrial land.
  • Currently, the investor has cleared the land and has been granted 90 hectares for lease by the provincial People’s Committee. The investor is currently carrying out land filling and infrastructure development.
  • The total leased area is 12 hectares, reaching an occupancy rate of 16.8%.

– Phase II (Zone B):

  • Covering an area of 49.6 hectares.
  • The investor has completed land clearance for 40 hectares.
Master plan map of Dong Van I Industrial Park -  Ninh Binh - TTTFIC Group
Master plan map of Dong Van I IP – Ninh Binh – TTTFIC Group

General evaluation:

Location:

  • Dong Van 1 Industrial Park has a flat terrain and stable geology, which is convenient for construction and industrial-commercial development.
  • National Highway 1A and the North-South railway run along the length of the industrial park, about 2km long, adjacent to Dong Van railway station.
  • The Cau Gie – Ninh Binh expressway project, which passes through Hanoi, Nam Dinh, and Ninh Binh provinces, will also run along Dong Van Industrial Park, providing favorable conditions for transportation and goods circulation within the industrial park.

Investment attraction:

  • Dong Van I Industrial Park is designed to be a multi-sector industrial park that utilizes modern high technology in accordance with international standards and is environmentally friendly.
  • Since its establishment, Dong Van I Industrial Park has proven its attractiveness by attracting many domestic and international investors.
  • As of now, there are 94 investment projects, including 46 FDI projects (from South Korea, Japan, Singapore, etc.) with a total investment capital of 668.7 million USD, and 48 DDI projects with a total investment capital of 4,632.99 billion VND.

Infrastructure of Dong Van I Industrial Park – Ninh Binh

Internal transportation:

  • Wide central roads and branch roads, with a main road of 36m and branch roads of 24m, ensuring normal operation of container trucks and heavy-duty trucks.

Electricity system:

  • Continuous and stable power supply from the 110KV high-voltage line near the southern border of Dong Van Industrial Park.

Public lighting system:

  • Separate lighting network designed along the traffic routes with a power supply system for daily use.

Water system:

  • Water supply system connected to each enterprise within the industrial park.

Wastewater and rainwater treatment system:

  • Separate systems for rainwater and wastewater (industrial and domestic wastewater).
  • Rainwater is collected through the system and discharged into rivers in the area.
  • Wastewater is collected and treated at the industrial park’s wastewater treatment plant.

Waste treatment:

  • The factories in the industrial park will sign contracts with specialized waste classification, collection, and transportation units to remove waste from the industrial park and prevent pollution to the environment.

Wastewater treatment:

  • All industrial wastewater and domestic wastewater will be treated by the enterprises to meet the minimum standards of Grade C water before being discharged into the common wastewater system of the industrial park.
  • Afterwards, the industrial park will continue to treat the wastewater to meet the standards set by the Vietnamese government.

Communication system:

  • A modern telecommunications and communication system that meets international standards, providing full information services both domestically and internationally.
A perspective on Dong Van I Industrial Park -  Ninh Binh - TTTFIC Group
A perspective on Dong Van I IP – Ninh Binh – TTTFIC Group

Attracting industries:

Dong Van I Industrial Park primarily attracts the following industries:

  • Electronics – Mechanical Engineering
  • Precision electronic component manufacturing
  • Motorcycle and automobile industry
  • Other supporting industries

Labor force and costs of Dong Van I Industrial Park – Ninh Binh

Abundant labor force:

  •  Ninh Binh province has a population of approximately 1.5 million people, of which 65% are laborers under the age of 35.
  • This abundant labor force, combined with labor from neighboring provinces, can adequately supply the needs of businesses within the industrial park.

Labor costs:

  • Dong Van I Industrial Park is located in Duy Tien district, within Zone I. Therefore, the current minimum wage in Zone I is 3,430,000 VND/month.
Industrial Land & Factory Availability in Vietnam | TTTFIC Group

TTTFIC Group | Vietnam Industrial Investment Intelligence & Business Advisory

TTTFIC Group provides industrial investment intelligence, industrial real estate advisory, site selection, factory and warehouse solutions, and business advisory services for foreign investors seeking to establish, expand, relocate, acquire, lease, or invest in manufacturing operations in Vietnam.

Industrial land, ready-built factories, warehouses, industrial parks, economic zones, high-tech parks, export processing zones, and other investment opportunities displayed on TTTFIC.com are provided for preliminary investor reference. Availability, pricing, infrastructure readiness, legal status, investment incentives, industry acceptance, and transaction conditions may change over time and should be independently verified before any investment decision is made.

TTMS™ Investment Status Control

Under the TTTFIC Transaction Management Standard – TTMS™, investment opportunities are evaluated according to their actual development and transaction status. TTTFIC Group distinguishes between Planned, Approved, Under Development, Infrastructure-Ready, Operating, and Currently Available opportunities. The appearance of an industrial park, industrial property, project, or investment location on this website does not automatically mean that land, factories, warehouses, licenses, utilities, or investment capacity are currently available.

Before recommending an opportunity for an investor’s shortlist, site visit, negotiation, or transaction, TTTFIC Group may conduct updated verification covering industrial land and factory availability, developer or asset-owner confirmation, pricing and commercial terms, land-use and project legal status, industry and zoning compatibility, IRC/ERC requirements, environmental compliance, fire prevention and fighting requirements, infrastructure and utility readiness, logistics connectivity, investment incentives, transaction conditions, and counterparty due diligence.

Industrial Investment Services for Foreign Investors in Vietnam

TTTFIC Group supports qualified foreign investors throughout the investment lifecycle, including Vietnam market entry, industrial site selection, industrial park comparison, industrial land acquisition and leasing, ready-built factory and warehouse leasing, built-to-suit factory solutions, factory acquisition and M&A, investment due diligence, transaction negotiation, IRC and ERC procedures, environmental and fire-safety compliance, legal coordination, construction support, and post-investment implementation.

Our controlled investment advisory process follows a structured decision pathway:

INVESTOR REQUEST → REQUIREMENT ANALYSIS → MARKET SCREENING → VERIFICATION → SHORTLIST → DUE DILIGENCE → SITE VISIT → NEGOTIATION → TRANSACTION → IMPLEMENTATION

This process is designed to help investors move beyond basic property listings and evaluate industrial investment opportunities based on verified commercial, legal, technical, infrastructure, location, and transaction considerations.

Verify Before You Invest

Industrial real estate conditions in Vietnam can change rapidly. Industrial land may become reserved or unavailable, factory inventory may be leased or sold, infrastructure schedules may change, and certain industries may require additional environmental, technical, zoning, or regulatory approvals. Investors should therefore request an updated verification from TTTFIC Group before relying on historical availability, pricing, project status, or other information published on the website.

TTTFIC Group | Your Trusted Partner in Vietnam’s Industrial Investment

Investor Advisory: +84 274 633 6888
Factory for Sale: +84 93 643 1788
Factory for Lease: +84 916 97 4488
Industrial Land: +84 973 108 629
Email: info@tttfic.com | marketing@tttfic.com

Head Office: No. 290 Dong Khoi Street, Binh Duong Ward, Ho Chi Minh City, Vietnam.

TTMS™ Controlled Investment Information | Verify Before Decision

0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Review is closed
Booking Tour
[wpforms id="179"]
Our Members