No. LAND-18492
Viet Kieu Industrial Land for Sale – Dong Nai
- Price: From US$80/sqm – Subject to confirmation
- Area: 10,000 sqm – 200,000 sqm – Subject to current availability
| Information | |
|---|---|
Operating time: 2021 - 2071 | Total Area: 264.77 Ha |
Infrastructure investors: Hoang Thinh Dat Corp | Price: 50-55 |
Building density: 60% | Occupancy: 84.3 % |
Address: Hoang Mai Ward, Nghe An Province, Vietnam | |
The Prime Minister approved the construction planning of Hoang Mai 1 Industrial Park – Nghe An Province in the South Thanh – Bac Nghe region, and it is listed as one of the prioritized industrial parks for development (Investment License No. 272203200026).
As of now, the Hoang Mai 1 Industrial Park project has completed almost all of its infrastructure construction and has attracted foreign investors to the industrial park.
The total area of the industrial park is 264.77 hectares, with a total investment of 740 billion VND by Hoang Thinh Dat Corp – Nghe An Branch.
Geographical location:
Hoang Mai 1 Industrial Park is located in Hoang Mai town, Nghe An province.
Hoang Thinh Dat Corp has successfully attracted the international conglomerate Juteng (Taiwan) and supporting enterprises to invest in the Juteng Vietnam electronic component and auto parts manufacturing plant project in Hoang Mai 1 Industrial Park.
This project, identified as a key project, serves as a lever and a premise for the development of Hoang Mai town in particular and Nghe An province in general, with a leased land area of 180 hectares and a total investment of up to 500 million USD.

The investor ensures a well-designed internal transportation system that allows smooth traffic flow throughout the industrial park.
The industrial park designs and constructs all internal roads in compliance with national regulations, using asphalt concrete. It equips the roads with a comprehensive and aesthetically pleasing high-pressure lighting system.
The national power grid supplies electricity to the industrial park through a 500kV system and a 2x63MVA 110kV transformer station located within the park.
The industrial park’s factories receive their water supply from the Hoang Mai Water Supply Company, which has a capacity of 80,000 m3/day.
The industrial park’s water treatment plant takes raw water from Vuc Mau Lake, which is located 13km away and on the surface. The plant treats the raw water to meet clean water standards, stores it in reservoirs, and pumps it to ensure a continuous supply of clean water to the factories.
The park’s treatment plant receives the industrial wastewater after preliminary treatment to remove hazardous chemicals exceeding Class B standards. The wastewater undergoes treatment to meet Class A wastewater standards, in line with national regulations. Finally, it is discharged into the industrial park’s drainage channel. The wastewater treatment plant in the industrial park has a capacity of 12,800m3/day, with a maximum capacity of 15,000m3/day.
The industrial park has an underground communication cable system, meeting international standards, which extends to the factory fences. The connection system ensures all communication needs are met by linking the industrial park’s information and communication center to the central post office in Hoang Mai. Essential services like private switchboards, international telephones, and remote conferences are provided. Dedicated channels, high-speed internet, and email services are also available. The communication system offers a wide range of services to meet diverse communication requirements.

Hoang Mai 1 Industrial Park is located in Hoang Mai town, Nghe An province, which falls under Region III. Therefore, the current minimum wage in Region III is 3,430,000 VND per month.
TTTFIC Group provides industrial investment intelligence, industrial real estate advisory, site selection, factory and warehouse solutions, and business advisory services for foreign investors seeking to establish, expand, relocate, acquire, lease, or invest in manufacturing operations in Vietnam.
Industrial land, ready-built factories, warehouses, industrial parks, economic zones, high-tech parks, export processing zones, and other investment opportunities displayed on TTTFIC.com are provided for preliminary investor reference. Availability, pricing, infrastructure readiness, legal status, investment incentives, industry acceptance, and transaction conditions may change over time and should be independently verified before any investment decision is made.
TTMS™ Investment Status Control
Under the TTTFIC Transaction Management Standard – TTMS™, investment opportunities are evaluated according to their actual development and transaction status. TTTFIC Group distinguishes between Planned, Approved, Under Development, Infrastructure-Ready, Operating, and Currently Available opportunities. The appearance of an industrial park, industrial property, project, or investment location on this website does not automatically mean that land, factories, warehouses, licenses, utilities, or investment capacity are currently available.
Before recommending an opportunity for an investor’s shortlist, site visit, negotiation, or transaction, TTTFIC Group may conduct updated verification covering industrial land and factory availability, developer or asset-owner confirmation, pricing and commercial terms, land-use and project legal status, industry and zoning compatibility, IRC/ERC requirements, environmental compliance, fire prevention and fighting requirements, infrastructure and utility readiness, logistics connectivity, investment incentives, transaction conditions, and counterparty due diligence.
Industrial Investment Services for Foreign Investors in Vietnam
TTTFIC Group supports qualified foreign investors throughout the investment lifecycle, including Vietnam market entry, industrial site selection, industrial park comparison, industrial land acquisition and leasing, ready-built factory and warehouse leasing, built-to-suit factory solutions, factory acquisition and M&A, investment due diligence, transaction negotiation, IRC and ERC procedures, environmental and fire-safety compliance, legal coordination, construction support, and post-investment implementation.
Our controlled investment advisory process follows a structured decision pathway:
INVESTOR REQUEST → REQUIREMENT ANALYSIS → MARKET SCREENING → VERIFICATION → SHORTLIST → DUE DILIGENCE → SITE VISIT → NEGOTIATION → TRANSACTION → IMPLEMENTATION
This process is designed to help investors move beyond basic property listings and evaluate industrial investment opportunities based on verified commercial, legal, technical, infrastructure, location, and transaction considerations.
Verify Before You Invest
Industrial real estate conditions in Vietnam can change rapidly. Industrial land may become reserved or unavailable, factory inventory may be leased or sold, infrastructure schedules may change, and certain industries may require additional environmental, technical, zoning, or regulatory approvals. Investors should therefore request an updated verification from TTTFIC Group before relying on historical availability, pricing, project status, or other information published on the website.
TTTFIC Group | Your Trusted Partner in Vietnam’s Industrial Investment
Investor Advisory: +84 274 633 6888
Factory for Sale: +84 93 643 1788
Factory for Lease: +84 916 97 4488
Industrial Land: +84 973 108 629
Email: info@tttfic.com | marketing@tttfic.com
Head Office: No. 290 Dong Khoi Street, Binh Duong Ward, Ho Chi Minh City, Vietnam.
Table of contents
0 customer reviews
1
0%0 review
2
0%0 review
3
0%0 review
4
0%0 review
5
0%0 review
No. LAND-18492
No. LAND-18525
No. LAND-18532
No. LAND-18544