Hoang Mai 1 Industrial Park - Nghe An Province

Home|INDUSTRIAL PARKS IN VIETNAM|Hoang Mai 1 Industrial Park – Nghe An Province
Information
Operating time: 2021 - 2071
Total Area: 264.77 Ha
Infrastructure investors: Hoang Thinh Dat Corp
Price: 50-55
Building density: 60%
Occupancy: 84.3 %
Address: Hoang Mai town, Nghe An province

Overview of Hoang Mai 1 Industrial Park – Nghe An Province:

The Prime Minister approved the construction planning of Hoang Mai 1 Industrial Park – Nghe An Province in the South Thanh – Bac Nghe region, and it is listed as one of the prioritized industrial parks for development (Investment License No. 272203200026).

As of now, the Hoang Mai 1 Industrial Park project has completed almost all of its infrastructure construction and has attracted foreign investors to the industrial park.
The total area of the industrial park is 264.77 hectares, with a total investment of 740 billion VND by Hoang Thinh Dat Corp – Nghe An Branch.

Geographical location:

Hoang Mai 1 Industrial Park is located in Hoang Mai town, Nghe An province.

  • Hoang Mai 1 Industrial Park has a very convenient transportation location, allowing easy access to seaports, road ports, and airports, thus saving transportation costs and time, especially for import and export activities.
  • The industrial park is located in Quynh Luu district, Nghe An province, bordering Thanh Hoa province. The area benefits from an abundant young labor force, providing favorable conditions for labor recruitment and training. Investors can save costs on labor and access affordable services in the region.

Hoang Thinh Dat Corp has successfully attracted the international conglomerate Juteng (Taiwan) and supporting enterprises to invest in the Juteng Vietnam electronic component and auto parts manufacturing plant project in Hoang Mai 1 Industrial Park.

This project, identified as a key project, serves as a lever and a premise for the development of Hoang Mai town in particular and Nghe An province in general, with a leased land area of 180 hectares and a total investment of up to 500 million USD.

An overview perspective of Hoang Mai 1 Industrial Park - Nghe An Province - TTTFIC Group

An overview perspective of Hoang Mai 1 IP – Nghe An Province – TTTFIC Group

Infrastructure of Hoang Mai 1 Industrial Park – Nghe An Province:

Internal transportation system:

The investor ensures a well-designed internal transportation system that allows smooth traffic flow throughout the industrial park.

  • The width of the central road in the industrial park measures 36 meters.
  • The main roads within the industrial cluster are 22.25 meters wide.

The industrial park designs and constructs all internal roads in compliance with national regulations, using asphalt concrete. It equips the roads with a comprehensive and aesthetically pleasing high-pressure lighting system.

Electricity system:

The national power grid supplies electricity to the industrial park through a 500kV system and a 2x63MVA 110kV transformer station located within the park.

Water supply system:

The industrial park’s factories receive their water supply from the Hoang Mai Water Supply Company, which has a capacity of 80,000 m3/day.
The industrial park’s water treatment plant takes raw water from Vuc Mau Lake, which is located 13km away and on the surface. The plant treats the raw water to meet clean water standards, stores it in reservoirs, and pumps it to ensure a continuous supply of clean water to the factories.

Wastewater treatment system:

The park’s treatment plant receives the industrial wastewater after preliminary treatment to remove hazardous chemicals exceeding Class B standards. The wastewater undergoes treatment to meet Class A wastewater standards, in line with national regulations. Finally, it is discharged into the industrial park’s drainage channel. The wastewater treatment plant in the industrial park has a capacity of 12,800m3/day, with a maximum capacity of 15,000m3/day.

Communication system:

The industrial park has an underground communication cable system, meeting international standards, which extends to the factory fences. The connection system ensures all communication needs are met by linking the industrial park’s information and communication center to the central post office in Hoang Mai. Essential services like private switchboards, international telephones, and remote conferences are provided. Dedicated channels, high-speed internet, and email services are also available. The communication system offers a wide range of services to meet diverse communication requirements.

Transportation connectivity to Hoang Mai 1 Industrial Park - Nghe An Province - TTTFIC Group

Transportation connectivity to Hoang Mai 1 Industrial Park – Nghe An Province – TTTFIC Group

Investment-attracting industries :

  • Assembly mechanical industry.
  • Steel production industry.
  • Precision engineering industry.
  • Wood processing industry.
  • Production of components for manufacturing and services.
  • Building materials industry, producing finished construction products.
  • Industries involved in processing agricultural, forestry, and mineral products.
  • Footwear manufacturing industry.
  • Garment industry.

Labor costs of Hoang Mai 1 Industrial Park – Nghe An Province:

Hoang Mai 1 Industrial Park is located in Hoang Mai town, Nghe An province, which falls under Region III. Therefore, the current minimum wage in Region III is 3,430,000 VND per month.

The land for lease that belong to Industrial Park has run out of stock. Only the land and warehouse has been re-invested by individual investor that still available

TTTFIC Group: Guide to Industrial Real Estate in Vietnam


  • Where you gain a comprehensive view of the ideal investment environment for foreign enterprises, we are TTTFIC Group, your reliable partner in the Industrial Real Estate sector.
  • For first-time investors in Vietnam, we assist in surveying suitable locations in Industrial Zones across the entire territory of Vietnam. We support handling investment procedures for projects.
  • Our Design & Build approach means that from the moment the investor completes the land lease location, we take responsibility for all steps, including obtaining IRC/ERC; DTM; Fire prevention and firefighting certificates; legal aspects of the project from the design phase; applying for construction permits; progressing to the construction phase, and completing the factory for handover to the investor in an operational state in a turnkey manner.
  • You don’t waste time searching, don’t incur additional consulting fees, and don’t have to spend money on investment estimates. We offer a complete package from receiving the client’s idea to completing the project, ensuring a smooth start of operations, reducing 2/3 of the time, effort, and money for you.
  • Services include Lease, Purchase, Sale, and M&A (Merger & Acquisition): We provide specialized information and support for your real estate needs in key business areas.
  • Legal Consultation: Our experienced legal team assists with real estate-related issues, ensuring smooth procedures for foreign investors.
  • Foreign Direct Investment (FDI) Establishment: We guide the easy establishment of foreign direct investment businesses, ensuring compliance with regulations.
  • Investment Project Development Consultation: From market surveys to detailed planning, we support the development of your project.
  • Construction Licensing & Compliance: We assist in obtaining permits, ensuring compliance with safety and environmental standards.
  • Registration & Tax Consultation: We handle tax compliance, ensuring your business meets all legal regulations.
  • With over 20 years of experience in Design & Build for FDI projects of all scales. If you’re seeking industrial real estate in Vietnam, give us a call! With a team of experienced experts, engineers, and lawyers, we have assisted thousands in property buy, sell, M&A, and industrial real estate leasing (especially investors from the US, Germany, Denmark, Sweden, the UK, Korea, Japan, Taiwan, China, India, Singapore…).
  • Together, we can build a prosperous and sustainable future for both businesses and communities. We look forward to collaborating with you.

Industrial real estate in industrial zones, Vietnam


TTTFIC Group 

Address: No.290, Dong Khoi Street, Hoa Phu Ward, Thu Dau Mot City (Binh Duong New City), Binh Duong Province, Vietnam.

https://tttfic.com
https://tttland.vn
https://24hbdfic.com
https://ttic.vip
https://247bdipss.com

0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Submit a review

  • Required
  • Required
  • Required

There are no reviews yet

Booking Tour
Lawyer and legal consultants accompany to consult regulations, laws and legalities.
Pick-up free services around 100km
In person meeting with Landlords/ Industrial Park Management as well as visiting properties.

Compare Hoang Mai 1 Industrial Park - Nghe An Province

Click on the object to be compared
Hoang Mai 1 Industrial Park - Nghe An Province

Hoang Mai 1 Industrial Park - Nghe An Province

  • Price: 50-55
  • Area: 264.77 Ha

Suggest Industrial Park

Bac Vinh Industrial Park - Nghe An Province

Bac Vinh Industrial Park - Nghe An Province

  • 30 USD/m2 / 143.17 Ha
Tan Ky Industrial Park - Nghe An

Tan Ky Industrial Park - Nghe An

  • 50 USD/m2 / 600 Ha
Nghia Dan Industrial Park - Nghe An Province

Nghia Dan Industrial Park - Nghe An Province

  • 30 USD/m2 / 245.68 ha
Tho Loc Industrial Park - Nghe An

Tho Loc Industrial Park - Nghe An

  • 50 USD/m2 / 1.159,71 Ha
WHA 1 Industrial Zone - Nghe An

WHA 1 Industrial Zone - Nghe An

  • 70 USD/m2 / 498 ha

Choose an industrial park

Our Members