Factory for Sale in Nam Tan Uyen Expansion – US$7.5 Million

Home|Industrial Factory, Warehouse & Land in Vietnam|Factory for Sale in Nam Tan Uyen Expansion – US$7.5 Million
Status
||
Available

I. Factory Complex Overview

Approximately 32,000 m² of land | Approximately 33,000 m² of factory floor area | Asking US$7.5 million — negotiable

TTTFIC Group introduces a factory complex for sale in Nam Tan Uyen Expansion Industrial Park, Ho Chi Minh City, Vietnam. The property combines an approximately 3.2-hectare industrial site with two two-story production buildings and supporting office facilities.

At an asking price of US$7.5 million, negotiable, the opportunity merits consideration by manufacturers seeking a substantial operating base and investors evaluating an industrial property acquisition in southern Vietnam.

The asking consideration equates to approximately US$234 per m² of land area, including the existing buildings within the proposed sale scope. This provides a useful acquisition cost benchmark for comparison with alternative sites and development proposals.

Learn more about the location through the Nam Tan Uyen Expansion Industrial Park profile.

Factory exterior with loading doors and concrete yard in Nam Tan Uyen Expansion Industrial Park, Ho Chi Minh City
Exterior view of the factory for sale in Nam Tan Uyen Expansion Industrial Park.

II. Location & Regional Connectivity

Located on Nam Tan Uyen Expansion Industrial Park, Tan Uyen Ward, Ho Chi Minh City, the property forms part of the established manufacturing corridor formerly within Binh Duong. Regional connections include the DT746 and DT747B road network.

Destination Published approximate park-level distance
Thanh Phuoc River Port 8 km
Song Than ICD 18 km
Song Than Freight Railway Station 19 km
Central Ho Chi Minh City 30 km
Cat Lai Port 32 km
Tan Son Nhat International Airport 34 km
Binh Duong New City area 8–10 km
Twin Doves Golf Club 10 km

These are published industrial-park references. Actual factory-gate road distances, container access and journey times should be checked for the buyer’s supply chain. The surrounding urban area provides access to workforce accommodation, banking, dining, healthcare and other business services.

III. Property Details & Asking Price

Sale Scope

Item Property information
Offering Entire factory complex
Approximate land area 32,000 m²
Approximate total factory floor area 33,000 m² across two production buildings
Production buildings Two two-story factory buildings
Offices Supporting office facilities; total area included in the sale to be reconciled with approved drawings
Supporting facilities Internal circulation, yards and ancillary facilities; final inventory to be agreed
Fire protection Automatic system reported; coverage and certification for the entire sale scope to be reviewed
Power supply Installed transformer capacity and available load to be confirmed
Building condition Existing factory complex; construction year and condition assessment available subject to document provision and inspection
Land-use expiry To be confirmed from the property’s land certificate and land sublease documentation
Transfer structure Asset/remaining land-use or sublease rights transaction, or company/share acquisition, subject to legal review and seller agreement
Handover and occupancy To be agreed after confirmation of current leases and possession arrangements
Proposed industries Industrial park-permitted activities, subject to the buyer’s process and required approvals

The seller reports construction permits, completion acceptance documentation and approval for leasing. Buyers should review the actual documents, title, encumbrances, remaining land term and transaction eligibility for the entire property.

Asking Price & Acquisition Benchmarks

Item Indicative amount
Total asking price US$7,500,000 — negotiable
Asking price divided by approximate land area US$234.38/m²
Asking price divided by approximate factory floor area US$227.27/m²

Both unit figures divide the same total consideration by different area measures. They are comparison metrics, not separate charges or an allocation of land and building value. Final included assets, taxes, transaction costs, currency and payment arrangements are subject to agreement and applicable requirements.

IV. Acquisition & Operating Cost Considerations

The buyer’s total investment should include the agreed consideration, applicable taxes and transaction expenses, legal and technical due diligence, any industrial park transfer or administration charges, refurbishment and production fit-out.

Operating item Assessment basis
Industrial park management Confirm the current tariff and whether charged on land or another agreed basis
Water and wastewater Confirm current unit rates, discharge limits and billing methodology
Electricity Confirm supply voltage, transformer ownership, contracted capacity and time-of-use tariff
Waste services Obtain quotations for the proposed production process
Maintenance, insurance and inspections Assess the full complex and annual operating obligations
Workforce Prepare current salary and benefit budgets by role, shift and skill level

For preliminary context, older published park references include management at VND9,300/m²/year, water at US$0.40/m³ and wastewater treatment at US$0.28/m³. These are not confirmed current quotations for this property.

Electricity should be budgeted separately for normal, peak and off-peak consumption at the applicable voltage level. Request the latest supplier schedule and recent electricity bills to model the proposed operation accurately.

V. Industrial Ecosystem & Supporting Services

Nam Tan Uyen Expansion and the surrounding Tan Uyen manufacturing corridor offer a business environment covering furniture, wood products, packaging, industrial services and logistics. Published park directories identify Home Decor Cai Xing, Kong Richs Furniture Vietnam and Keumsung Paper Vietnam among the area’s businesses.

The surrounding supplier base may support packaging procurement, equipment servicing, transport and subcontracting. Named businesses are location references; current operations and commercial suitability require confirmation.

VI. Investment Potential & Acquisition Advantages

A Substantial Site with Existing Production Buildings

Approximately 32,000 m² of land and 33,000 m² of factory floor area provide scale for a buyer considering production consolidation, relocation or expansion. Existing buildings may reduce the development work required compared with a new construction project, depending on technical suitability and upgrade needs.

A Clear Entry-Price Benchmark

At approximately US$234/m² of land area including the proposed building sale scope, the asking price provides a concrete basis for acquisition discussions. Buyers can compare the total purchase and upgrade budget with alternatives after aligning land tenure, construction quality, usable floor area and transaction costs.

Potential for Owner Occupation or a Leasing Strategy

The two-building configuration may support owner occupation, phased use or a leasing strategy, subject to layout, access, approvals and existing commitments. A separately marketed portion offers 16,720 m² of factory space at an initial asking rent of US$3.80/m²/month, with offices and ancillary areas separately charged. This is an asking rental offer, not evidence of an executed lease or guaranteed income for the full complex.

An Established Industrial Location

The surrounding manufacturing network and regional logistics links support the property’s relevance to companies seeking a southern Vietnam industrial base.

TTTFIC’s assessment: the combination of site scale, existing production space and a negotiable US$7.5 million asking price warrants a focused site inspection and document review. Final acquisition value depends on the remaining land term, transfer structure, building condition, occupancy and suitability for the buyer’s project.

CONTACT TTTFIC GROUP — REQUEST THE SALE BRIEF

Contact TTTFIC Group for the current sale scope, available legal and technical documents, transaction discussions and an accompanied factory inspection.

TTTFIC GROUP | INDUSTRIAL REAL ESTATE & FDI INVESTMENT CONSULTING
Factory Acquisitions • Industrial Site Selection • FDI Investment Support
Vietnam Nationwide + Thailand
Tel / WhatsApp: +84 936 431 788
Email: marketing@tttfic.com

TTTFIC Group — Your Strategic Partner for Industrial Investment in Vietnam.

Product type
Factory Complex for Sale
Total area
Approx. 32,000 m² land area
Construction area
Approx. 33,000 m² total factory floor area across two two-story buildings; total footprint to be verified
Office area
Office facilities included; total sale-scope office area to be confirmed
Secondary works
Internal circulation, yards and ancillary facilities — final asset inventory to be agreed
Fire protection system
Automatic system reported; full-complex documentation and coverage to be verified
Power system
Installed transformer capacity and available load to be confirmed
Used Time
Remaining land-use term to be confirmed from title and land sublease documents
Manufacturing industry
Industrial park-permitted activities, subject to project-specific approvals
HCMC Center - 30 km
ICD Song Than Port - 18 km
Tan Son Nhat International Airport - 34 km
0,05 USD/KWh
0,4 USD/m3
0,28
Management fee: 9.300 VND/m2/year
0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Submit a review

  • Required
  • Required
  • Required

There are no reviews yet

Our Members