Tam Duong I Industrial Park - Phu Tho

Home|INDUSTRIAL PARKS IN VIETNAM|Tam Duong I Industrial Park – Phu Tho
Information
Operating time: 2021 - 2071
Total Area: 162.3 Ha
Infrastructure investors: Sonha International Corporation
Price: 110 USD/m²
Building density: 70 %
Occupancy: Updating
Address: Tam Duong Commune, Phu Tho Province, Vietnam

I. Overview of Tam Duong I Industrial Park – Phu Tho province

Tam Duong I Industrial Park has been approved for detailed construction planning at a ratio of 1/500 by the People’s Committee of Phu Tho province, according to Decision No. 2397/QD-UBND dated September 24, 2020, with a planned area of 162.33 hectares.

Of this, the industrial park land area is 156.76 hectares, with 116.03 hectares allocated for industrial land rental (accounting for 17.01% of the total), and 5.57 hectares designated for non-industrial land, including safety facilities, power corridors, canals, and greenery.

On March 10, 2021, the investment project for the construction and operation of technical infrastructure in Tam Duong I Industrial Park was approved by the Prime Minister under Decision No. 336/QD-TTg dated March 10, 2021, with Sonha International Corporation selected as the investor. The project has an operational period of 50 years.

With a total investment capital of 1,576 billion VND, the project is expected to hand over the first phase of land in the fourth quarter of 2023 and commence operations in the third quarter of 2024.

II. Geographical location in Tam Duong I Industrial Park – Phu Tho

Tam Duong I Industrial Park is located within the administrative boundaries of Huong Dao, Dao Tu, Hop Hoa town, Tam Duong district, Phu Tho province.

Strategic geographical position:

  • It is situated close to the Ha Noi – Lao Cai national highway, 3km from the IC4 interchange, and near the IC5 interchange (scheduled to be completed in 2025).
  • It is within the economic corridor of Cao Minh – Lao Cai – Ha Noi – Hai Phong, Quang Ninh.
  • It is located on the National Highway 2 (2a, 2b, 2c) and 23.

Convenient transportation connections:

  • Road: To Ha Noi city center: 44km, Ha Noi – Lao Cai Expressway: 2km.
  • Air: Noi Bai International Airport: 28km.
  • Railway: It is on the Ha Noi – Lao Cai regional railway line.
  • Vinh Phuc ICD Dry Port: 10 minutes drive.
  • Waterway: Doc Bac Port: 20km, Hai Phong Port: 130km, Quang Ninh – Cai Lan Port: 160km.
Master plan map of Tam Duong I Industrial Park - Phu Tho - TTTFIC Group
Master plan map of Tam Duong I Industrial Park – Phu Tho – TTTFIC Group

III. Infrastructure:

Internal transportation system:

  • Main roads up to 48m wide.
  • Branch roads range from 14.5m to 24m wide.

Wastewater treatment system:

  • Centralized wastewater treatment plant with a capacity of 3,873 m3/day and night.

Power supply system:

  • 22kV power lines connected to each plot of land in the industrial park.
  • 110kV transformer station with a power supply capacity of 2x63mVA.

Water supply system:

  • Water supply capacity of up to 10,000m3/day and night.

Communication system:

  • Multi-network, multi-frequency system invested, and built-in synchronization with the technical infrastructure in the area.

Fire protection system:

  • Low-pressure water supply system with fire hydrants arranged according to fire protection regulations.

IV. Investment-attracting industries in Tam Duong I Industrial Park – Phu Tho

Tam Duong I Industrial Park is planned as a green and clean industrial park, attracting investment in the following key industries:

  • Electronics, Technology.
  • Food industry.
  • Automotive and supporting industries, mechanical manufacturing.
  • Other light industries.
  • Industries causing pollution such as electroplating, textile dyeing, and metallurgy are not encouraged for investment.

V. Investment costs:

  • Infrastructure rental fee: From 110 USD/m2.
  • This fee does not include land rent and industrial park management fees. The rental fee may vary depending on the time.
  • Infrastructure management and maintenance fee: 0.6 USD/m2/year.
  • Electricity rates: Peak hours: 1.1 USD/KW. Normal hours: 0.8 VND/KW. Off-peak hours: 0.6 VND/KW.
  • Water supply price: 0.67 USD/m3, subject to change based on the water supply provider’s rates.
  • Wastewater treatment price: 0.47 USD/m3.
    Input treatment standard: Column A for metal targets and Column B for organic targets according to QCVN40/2011/BTNMT.
An overview perspective of Tam Duong I Industrial Park - Phu Tho - TTTFIC Group
An overview perspective of Tam Duong I Industrial Park – Phu Tho – TTTFIC Group

VI. Investment incentives:

Phu Tho is a locality with a favorable business promotion mechanism, attracting investment, and developing industries that rank at the top nationwide. It is a typical locality in terms of macroeconomic development and administrative procedure support. Tam Duong I Industrial Park has the advantage of a convenient geographical location for establishing manufacturing plants or industrial support services.

  • 100% corporate income tax exemption for the first 2 years.
  • 50% reduction in corporate income tax for the following 4 years.
  • Support from the investor: Investment registration license, factory design and construction consulting, and other administrative procedures.

VII. Labor sources and costs in Tam Duong I Industrial Park – Phu Tho

Labor sources:

  • As of 2021, Phu Tho province has an average population of approximately 1,191.8 thousand people, including about 642 thousand people of working age (15 years and older). The labor force participation rate in the province is 54%.
  • From 2017 to 2021, Phu Tho province has trained approximately 142,226 individuals. This includes 5,764 individuals with college degrees, 26,878 individuals with intermediate degrees, and 109,584 individuals with elementary degrees.
  • By 2025, Phu Tho province aims to achieve a labor force training rate of 82%, with 40% of the workforce having obtained degrees or certificates.

Costs:

  • Tam Duong I Industrial Park is located in Tam Duong district, Phu Tho Province, in Region III.
  • Therefore, the current minimum wage in Region III is 3,430,000 VND/month.
Industrial Land & Factory Availability in Vietnam | TTTFIC Group

TTTFIC Group | Vietnam Industrial Investment Intelligence & Business Advisory

TTTFIC Group provides industrial investment intelligence, industrial real estate advisory, site selection, factory and warehouse solutions, and business advisory services for foreign investors seeking to establish, expand, relocate, acquire, lease, or invest in manufacturing operations in Vietnam.

Industrial land, ready-built factories, warehouses, industrial parks, economic zones, high-tech parks, export processing zones, and other investment opportunities displayed on TTTFIC.com are provided for preliminary investor reference. Availability, pricing, infrastructure readiness, legal status, investment incentives, industry acceptance, and transaction conditions may change over time and should be independently verified before any investment decision is made.

TTMS™ Investment Status Control

Under the TTTFIC Transaction Management Standard – TTMS™, investment opportunities are evaluated according to their actual development and transaction status. TTTFIC Group distinguishes between Planned, Approved, Under Development, Infrastructure-Ready, Operating, and Currently Available opportunities. The appearance of an industrial park, industrial property, project, or investment location on this website does not automatically mean that land, factories, warehouses, licenses, utilities, or investment capacity are currently available.

Before recommending an opportunity for an investor’s shortlist, site visit, negotiation, or transaction, TTTFIC Group may conduct updated verification covering industrial land and factory availability, developer or asset-owner confirmation, pricing and commercial terms, land-use and project legal status, industry and zoning compatibility, IRC/ERC requirements, environmental compliance, fire prevention and fighting requirements, infrastructure and utility readiness, logistics connectivity, investment incentives, transaction conditions, and counterparty due diligence.

Industrial Investment Services for Foreign Investors in Vietnam

TTTFIC Group supports qualified foreign investors throughout the investment lifecycle, including Vietnam market entry, industrial site selection, industrial park comparison, industrial land acquisition and leasing, ready-built factory and warehouse leasing, built-to-suit factory solutions, factory acquisition and M&A, investment due diligence, transaction negotiation, IRC and ERC procedures, environmental and fire-safety compliance, legal coordination, construction support, and post-investment implementation.

Our controlled investment advisory process follows a structured decision pathway:

INVESTOR REQUEST → REQUIREMENT ANALYSIS → MARKET SCREENING → VERIFICATION → SHORTLIST → DUE DILIGENCE → SITE VISIT → NEGOTIATION → TRANSACTION → IMPLEMENTATION

This process is designed to help investors move beyond basic property listings and evaluate industrial investment opportunities based on verified commercial, legal, technical, infrastructure, location, and transaction considerations.

Verify Before You Invest

Industrial real estate conditions in Vietnam can change rapidly. Industrial land may become reserved or unavailable, factory inventory may be leased or sold, infrastructure schedules may change, and certain industries may require additional environmental, technical, zoning, or regulatory approvals. Investors should therefore request an updated verification from TTTFIC Group before relying on historical availability, pricing, project status, or other information published on the website.

TTTFIC Group | Your Trusted Partner in Vietnam’s Industrial Investment

Investor Advisory: +84 274 633 6888
Factory for Sale: +84 93 643 1788
Factory for Lease: +84 916 97 4488
Industrial Land: +84 973 108 629
Email: info@tttfic.com | marketing@tttfic.com

Head Office: No. 290 Dong Khoi Street, Binh Duong Ward, Ho Chi Minh City, Vietnam.

TTMS™ Controlled Investment Information | Verify Before Decision

0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Review is closed
Booking Tour
[wpforms id="179"]
Our Members