Hoa Binh Industrial Park

Home|INDUSTRIAL PARKS IN VIETNAM|Hoa Binh Industrial Park
Information
Operating time: 2008 - 2058
Total Area: 60 Ha
Infrastructure investors: Investment and Development Company Infrastructure Quang Ngai Economic Zone
Price: 50 USD/m²
Building density: 60%
Occupancy: 90%
Address: Hamlet 2 and Hamlet 4, Dak Ro Wa Commune, Quang Ngai Province, Vietnam

I. Overview of Hoa Binh Industrial Park:

The Industrial Zone is located at 304 Pham Van Dong Street, Nguyen Trai Ward, , Quang Ngai Province.

The founding time is according to the Decision No. 358/QD-CT dated 19/6/2013 by the People’s Committee of Quang Ngai Province to establish the Hoa Binh Industrial Zone, Quang Ngai Province. The Quang Ngai Provincial Economic Zone Infrastructure Development Investment Company develops it.

Hoa Binh Industrial Zone is strategically positioned on National Highway 14, the main route connecting South Central Highlands, coastal Central, and Southern provinces.

It serves as the southern gateway to Quang Ngai City, located just 2 kilometers from the city center in Le Loi Ward.

Furthermore, leveraging its natural resource potential, ample labor force, and favorable social conditions, the economic zone holds a strategic position in the heart of the Central Highlands. It acts as a pivotal economic gateway linking Vietnam, Laos, and Cambodia, as well as the northeastern provinces of Thailand. Investing in this region promises substantial returns.

Master plan map of Hoa Binh Industrial Park - Quang Ngai - TTTFIC Group
Master plan map of Hoa Binh Industrial Park – Quang Ngai – TTTFIC Group

II. Infrastructure of Hoa Binh Industrial Park:

Industrial Zone Internal Traffic:

The designers planned a main traffic axis (Route 1) to run from National Highway 14 to the western end of the Industrial Zone, cutting across the last ring road. This design created the main traffic route within the Industrial Zone.

They also established a second route that connects to the existing road in the North and passes through the Industrial Zone along the North-South axis. This route further connects to the existing road in the residential area located in the South of the Industrial Zone:

  • Route 1 – B1 cross-section = 32.0 m (8+16+ 8) m.
  • Route 2 – B2 cross-section = 24.0 m (6+12+6) m.

Traffic connection to the area:

  • Ring road and foreign traffic: Based on existing traffic routes of National Highway 14, the northern land road of the Industrial Zone, the ring road, and foreign traffic of the Industrial Zone were designed:
    National Highway 14: The section passing through the Industrial Zone was designed wide and ensured the isolation distance between National Highway 14 and the Industrial Zone, with a B1 cross-section = 45.0 m (18+10×2+2+5)m.
  • Northern ring route: Designed in two sections.

Section 1: Connected from National Highway 14, passing through the boundary between Be, as in Be jorome!

Section 2: Connected from Route 1, passing through the boundary between the Hoa Binh industrial cluster and the northern joint venture, connecting to the IaReBang creek water dam, B3 cross-section = 17m (4.5+8+4.5)m.

Western ring route:

Designed to connect from the northern ring route, passing through the South, separating the Industrial Zone and the fields to the West of the Industrial Zone, B4 cross-section = 17m (4.5 + 8 + 4.5)m.

Electrical Supply System:

  • Power source: Use a 110/22kv-2x10MNA transformer station from the 110kv line to supply the Southern area of DakBla River.
  • Grid:

The grid mostly goes above ground, starting from the 110 KV Industrial Zone station, pole lines arranged on the sidewalk part of the traffic routes, centrifugal concrete poles 12.5 m high.

Street lighting is supplied by a single-phase grid station, using mercury pressure cable bulbs and 8.5m high centrifugal concrete poles.

Water Supply System:

  • Source: Initially use groundwater (drilled wells), in the following years use the common water source of Quang Ngai City.
  • Network: The water supply pipe has a diameter of ɸ 100; ɸ 150; ɸ 200; total length of 215.51. The distribution pipe, regardless of its length, connects to the transfer pipe with a diameter of ɸ 75; on average, the length from the distribution pipe connects each to the same level as in the art of the earth.

Wastewater Treatment System, Environmental Sanitation Waste:

  • The stormwater and wastewater system is completely separate. Workshops and factories generating particularly harmful wastewater must undergo treatment to comply with the standards.
  • The construction of ditches and sewers utilizes round concrete sewers and reinforced concrete culverts.
A perspective on Hoa Binh Industrial Park - Quang Ngai - TTTFIC Group
A perspective on Hoa Binh Industrial Park – Quang Ngai – TTTFIC Group

III. Industry attracting investment of The Industrial Park:

The Industrial Zone focuses on constructing medium and small-sized factories and industrial enterprises that cause minimal environmental pollution. Thus, the sectors that draw investment to cater to both domestic demand and export are:

  • Processing of forestry products
  • Production of construction materials
  • Manufacturing of transportation equipment
  • Production of electrical and electronic equipment
  • Garment industry.

FB: https://www.facebook.com/TTTFICgroup

Industrial Land & Factory Availability in Vietnam | TTTFIC Group

TTTFIC Group | Vietnam Industrial Investment Intelligence & Business Advisory

TTTFIC Group provides industrial investment intelligence, industrial real estate advisory, site selection, factory and warehouse solutions, and business advisory services for foreign investors seeking to establish, expand, relocate, acquire, lease, or invest in manufacturing operations in Vietnam.

Industrial land, ready-built factories, warehouses, industrial parks, economic zones, high-tech parks, export processing zones, and other investment opportunities displayed on TTTFIC.com are provided for preliminary investor reference. Availability, pricing, infrastructure readiness, legal status, investment incentives, industry acceptance, and transaction conditions may change over time and should be independently verified before any investment decision is made.

TTMS™ Investment Status Control

Under the TTTFIC Transaction Management Standard – TTMS™, investment opportunities are evaluated according to their actual development and transaction status. TTTFIC Group distinguishes between Planned, Approved, Under Development, Infrastructure-Ready, Operating, and Currently Available opportunities. The appearance of an industrial park, industrial property, project, or investment location on this website does not automatically mean that land, factories, warehouses, licenses, utilities, or investment capacity are currently available.

Before recommending an opportunity for an investor’s shortlist, site visit, negotiation, or transaction, TTTFIC Group may conduct updated verification covering industrial land and factory availability, developer or asset-owner confirmation, pricing and commercial terms, land-use and project legal status, industry and zoning compatibility, IRC/ERC requirements, environmental compliance, fire prevention and fighting requirements, infrastructure and utility readiness, logistics connectivity, investment incentives, transaction conditions, and counterparty due diligence.

Industrial Investment Services for Foreign Investors in Vietnam

TTTFIC Group supports qualified foreign investors throughout the investment lifecycle, including Vietnam market entry, industrial site selection, industrial park comparison, industrial land acquisition and leasing, ready-built factory and warehouse leasing, built-to-suit factory solutions, factory acquisition and M&A, investment due diligence, transaction negotiation, IRC and ERC procedures, environmental and fire-safety compliance, legal coordination, construction support, and post-investment implementation.

Our controlled investment advisory process follows a structured decision pathway:

INVESTOR REQUEST → REQUIREMENT ANALYSIS → MARKET SCREENING → VERIFICATION → SHORTLIST → DUE DILIGENCE → SITE VISIT → NEGOTIATION → TRANSACTION → IMPLEMENTATION

This process is designed to help investors move beyond basic property listings and evaluate industrial investment opportunities based on verified commercial, legal, technical, infrastructure, location, and transaction considerations.

Verify Before You Invest

Industrial real estate conditions in Vietnam can change rapidly. Industrial land may become reserved or unavailable, factory inventory may be leased or sold, infrastructure schedules may change, and certain industries may require additional environmental, technical, zoning, or regulatory approvals. Investors should therefore request an updated verification from TTTFIC Group before relying on historical availability, pricing, project status, or other information published on the website.

TTTFIC Group | Your Trusted Partner in Vietnam’s Industrial Investment

Investor Advisory: +84 274 633 6888
Factory for Sale: +84 93 643 1788
Factory for Lease: +84 916 97 4488
Industrial Land: +84 973 108 629
Email: info@tttfic.com | marketing@tttfic.com

Head Office: No. 290 Dong Khoi Street, Binh Duong Ward, Ho Chi Minh City, Vietnam.

TTMS™ Controlled Investment Information | Verify Before Decision

Chưa có tọa độ bản đồ.
Có địa chỉ: Hamlet 2 and Hamlet 4, Dak Ro Wa Commune, Quang Ngai Province, Vietnam
0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Review is closed
Booking Tour
[wpforms id="179"]
Our Members