Operating time: 2009 - 2059
Total Area: 326 ha
Infrastructure investors: Ca Mau Economic Zone Authority
Price: 50 USD/m2
Building density: 60%
Occupancy: 11%
Address: Luong The Tran Commune, Ca Mau Province, Vietnam

I. Overview of Hoa Trung Industrial Park:

Hoa Trung Industrial Park was established according to Decision No. 1633/QD-UBND dated September 21, 2009.

  • The construction zoning plan was approved by Decision No. 2135/QD-UBND on December 9, 2016, and Decision No. 711/QD-UBND on April 25, 2019.
  • The adjusted construction zoning plan for Hoa Trung Industrial Park at a scale of 1/2000 was reviewed and approved by the Department of Construction in Report No. 3839/BCTD-SXD dated December 24, 2021.
  • The Provincial People’s Committee has submitted a request to the Ministry of Construction for approval of the adjusted plan in Official Letter No. 01/TTr-UBND dated January 5, 2022, covering an area of 326 hectares.

Geographical Location:

Hoa Trung Industrial Park is located in Luong The Tran Commune, Cai Nuoc District, Ca Mau Province.

  • It is adjacent to the north by Luong The Tran Canal and existing residential areas.
  • It is bordered by aquaculture land to the south.
  • It is adjacent to the east by Ganh Hao River.
  • It is bordered by aquaculture land and residential areas along National Highway 1A to the west.

Situated 5 km from the city center of Ca Mau, 7 km from Ca Mau Airport, and 48 km from Nam Can Port, Hoa Trung Industrial Park offers convenient transportation both by road and waterway.

 

Master plan map of Hoa Trung Industrial Park - Ca Mau Province - TTTFIC Group
Master plan map of Hoa Trung Industrial Park – Ca Mau Province – TTTFIC Group

II. Infrastructure of Hoa Trung Industrial Park:

Transportation:

  • Road: The external transportation system includes Road No. 1 and Road No. 4. The internal transportation network within the industrial park consists of roads with a width of 20-40 meters, forming a grid pattern.
  • Waterway: Ganh Hao River and Luong The Tran canal serve as important waterway transportation systems, with a planned network of ports and docks for water transportation.

Water Supply:

  • The water supply demand for the industrial park is approximately 14,500 cubic meters per day.
  • The water source is groundwater.
  • The water supply network utilizes uPVC pipes laid along the roads, buried at a depth of 0.7 to 1.0 meters, with a distance of 1.0 meter from the road boundary.
  • The industrial park management board installs fire hydrants on all roads within the sidewalk, with a distance of 0.5m from the edge of the sidewalk. The distance between fire hydrants is 100 to 150 meters.

Wastewater Treatment:

  • The planned total wastewater volume for the industrial park is approximately 10,052 cubic meters per day.
  • Domestic wastewater and industrial wastewater within the industrial park are collected and discharged to the wastewater treatment plant via drainage pipes. The industrial park management has built a wastewater treatment plant with a capacity of 19,000 cubic meters per day.
  • The wastewater drainage system utilizes either reinforced concrete pipes or HDPE pipes with a diameter of Ø=300-1000 mm. Industrial wastewater must undergo treatment at the treatment plant to meet the required standards before being discharged into the environment.

Solid Waste Management:

  • The estimated solid waste volume is approximately 110.0 tons per day.
  • The unit in charge of solid waste collection will sort and collect it at specified points before transporting it to the waste treatment facility.
  • An established solid waste collection point has a capacity of 34 tons per day.

Electricity Supply:

  • The total power demand for the industrial park is 3000 KVA. The 110/22KV – 20MVA Cai Nuoc substation supplies the power source.
  • The industrial park management board plans to build Five new distribution substations with a total capacity of 3,000 kVA at 380/220V to provide low voltage electricity of 0.4 kV for the industrial park.
  • The length of the new 22kV medium-voltage line is approximately 7.4 kilometers. The electrical network is underground.

Public Lighting System:

  • The lighting system utilizes high-pressure mercury lamps with a power range of 100W-400W at 220V.
  • The lighting system utilizes underground cables.
  • The infrastructure substations and control centers provide the power supply for the lighting system.

Communication Information:

  • Supply source: The communication system for the planned area is a telecommunications network running along National Highway 1A and connecting to the industrial park via Road No. 1.
  • The industrial park management board establishes communication transmission lines along the planned routes, using optical cables from centralized telephone exchange substations.
A perspective on Hoa Trung Industrial Park - Ca Mau Province - TTTFIC Group
A perspective on Hoa Trung Industrial Park – Ca Mau Province – TTTFIC Group

III. Industry attracting investment of Hoa Trung Industrial Park:

Investment attraction field:

  • Industries include seafood processing for export, livestock products, animal feed production.
  • Industries include grain processing, food processing, biotechnology products, feed for aquaculture, and supporting industries for production and processing.
  • The industries encompass mining and the manufacturing of various construction materials.
  • Warehousing and services.

IV. Investment incentive policy of Hoa Trung Industrial Park:

Exemption of land rent:

– During the initial construction period, there is an exemption of land rent for a maximum duration of 03 years from the date of the land lease decision.

– Exemption of land rent after the basic construction period:

  • 11 years for projects not included in the list of investment incentives.
  • 15 years for projects included in the list of investment incentives.

– Full exemption of land rent and water surface rent for the entire lease period for investment projects in specially privileged sectors.

Corporate income tax:

  • The corporate income tax rate is 10% for 15 years, starting from the commencement of business operations of the investment project.
  • Exemption of corporate income tax for 04 years from the first taxable income and a 50% reduction in tax payable for the following 09 years.

Import tax:

  • Exemption of import tax for imported goods serving fixed asset creation in investment incentive projects
  • Exemption of import tax for raw materials, supplies, and components for a period of 05 years (raw materials, supplies, and components not yet produced domestically).
  • Exemption of tax for plant varieties, animal breeds, fertilizers, and plant protection drugs (domestically non-produced plant varieties, animal breeds, fertilizers, and plant protection drugs).

Other support:

In addition, the projects are eligible for various related supports, such as:

  • Vocational training and labor introduction.
  • Support for technology transfer and application.
  • Trade and investment promotion support.
  • Credit support.
  • Public relations support.
  • Agricultural and rural development support.
  • Administrative procedure support under the one-stop mechanism coordinated by the Management Board.
Industrial Land & Factory Availability in Vietnam | TTTFIC Group

TTTFIC Group | Vietnam Industrial Investment Intelligence & Business Advisory

TTTFIC Group provides industrial investment intelligence, industrial real estate advisory, site selection, factory and warehouse solutions, and business advisory services for foreign investors seeking to establish, expand, relocate, acquire, lease, or invest in manufacturing operations in Vietnam.

Industrial land, ready-built factories, warehouses, industrial parks, economic zones, high-tech parks, export processing zones, and other investment opportunities displayed on TTTFIC.com are provided for preliminary investor reference. Availability, pricing, infrastructure readiness, legal status, investment incentives, industry acceptance, and transaction conditions may change over time and should be independently verified before any investment decision is made.

TTMS™ Investment Status Control

Under the TTTFIC Transaction Management Standard – TTMS™, investment opportunities are evaluated according to their actual development and transaction status. TTTFIC Group distinguishes between Planned, Approved, Under Development, Infrastructure-Ready, Operating, and Currently Available opportunities. The appearance of an industrial park, industrial property, project, or investment location on this website does not automatically mean that land, factories, warehouses, licenses, utilities, or investment capacity are currently available.

Before recommending an opportunity for an investor’s shortlist, site visit, negotiation, or transaction, TTTFIC Group may conduct updated verification covering industrial land and factory availability, developer or asset-owner confirmation, pricing and commercial terms, land-use and project legal status, industry and zoning compatibility, IRC/ERC requirements, environmental compliance, fire prevention and fighting requirements, infrastructure and utility readiness, logistics connectivity, investment incentives, transaction conditions, and counterparty due diligence.

Industrial Investment Services for Foreign Investors in Vietnam

TTTFIC Group supports qualified foreign investors throughout the investment lifecycle, including Vietnam market entry, industrial site selection, industrial park comparison, industrial land acquisition and leasing, ready-built factory and warehouse leasing, built-to-suit factory solutions, factory acquisition and M&A, investment due diligence, transaction negotiation, IRC and ERC procedures, environmental and fire-safety compliance, legal coordination, construction support, and post-investment implementation.

Our controlled investment advisory process follows a structured decision pathway:

INVESTOR REQUEST → REQUIREMENT ANALYSIS → MARKET SCREENING → VERIFICATION → SHORTLIST → DUE DILIGENCE → SITE VISIT → NEGOTIATION → TRANSACTION → IMPLEMENTATION

This process is designed to help investors move beyond basic property listings and evaluate industrial investment opportunities based on verified commercial, legal, technical, infrastructure, location, and transaction considerations.

Verify Before You Invest

Industrial real estate conditions in Vietnam can change rapidly. Industrial land may become reserved or unavailable, factory inventory may be leased or sold, infrastructure schedules may change, and certain industries may require additional environmental, technical, zoning, or regulatory approvals. Investors should therefore request an updated verification from TTTFIC Group before relying on historical availability, pricing, project status, or other information published on the website.

TTTFIC Group | Your Trusted Partner in Vietnam’s Industrial Investment

Investor Advisory: +84 274 633 6888
Factory for Sale: +84 93 643 1788
Factory for Lease: +84 916 97 4488
Industrial Land: +84 973 108 629
Email: info@tttfic.com | marketing@tttfic.com

Head Office: No. 290 Dong Khoi Street, Binh Duong Ward, Ho Chi Minh City, Vietnam.

TTMS™ Controlled Investment Information | Verify Before Decision

0 Reviews
0

0 customer reviews

  • 1

    0%0 review

  • 2

    0%0 review

  • 3

    0%0 review

  • 4

    0%0 review

  • 5

    0%0 review

Review is closed
Booking Tour
[wpforms id="179"]
Our Members